Catalogue
Fabrics / Membrane
Use the “Membrane” category to compare items for a production order. Start with the required version and check the specifications on the selected product page.
Categories in this section
DELIM · B2B
Catalogue
Products found: 3
Membrane fabric Police 3L
MembraneComposition — previous catalogue description: Polyester 67%; cotton 33%
Membrane fabric Visibility
MembraneTextile component — previous catalogue description: Polyester, 100% · Membrane material — previous catalogue description: Polyester
About this category
Use the “Membrane” category to compare items for a production order. Start with the required version and check the specifications on the selected product page.
Choosing fabric for a production project
Start with the product construction: outer shells, linings and reinforcement panels call for different materials. Compare the composition, fabric weight, usable width and finish of each specific article. Similar colours or textures do not establish equivalent cutting and sewing performance.
Selection details for this category
For membrane materials, distinguish fabric requirements from seam sealing. Confirm compatibility with the joining process and request the required water-resistance and vapour-transmission data.
Examples from the catalog
Start your comparison with these specific items:
- Membrane fabric Modlin — tkanina_modlin
- Membrane fabric Police 3L — tkanina_police_3l
- Membrane fabric Visibility — tkanina_visibility
What to compare before ordering
- Fibre composition and fabric construction
- Fabric weight and usable roll width
- Face side, coating and cutting direction
- Compatibility with the lining, thread and finishing process
Check a sample in the proposed seam before cutting a production batch. If water resistance, colour fastness or abrasion performance matters, specify the test method and request results for the selected article.
Preparing an inquiry for DELIM
Add the required products to the cart. Use the item note to specify size, version, colour and quantity; for a replacement, include the existing article number. Use the contact page for a detailed project brief. Your manager will confirm availability, minimum order quantity, sample options, price and supply schedule for your inquiry.